Ask Gava
Kiswahili
← Business

Get KeNHA approval for a billboard or signboard on a highway road reserve

Kenya National Highways Authority · sources read 2 Oct 2026

Apply on the KeNHA Permits Portal (permits.kenha.co.ke) under Advertisement structures, with a geo-referenced location map and a structural design certified by a professional structural engineer. The fee is KSh 5,000 per square metre and the charter target is 15 working days.

Fee
KSh 5,000Billboard or signboard, per square metre
How long
15 working days (KeNHA service charter)
Where
Online on the KeNHA Permits Portal (permits.kenha.co.ke, eCitizen login available); KeNHA regional and corridor offices handle site visits
Go to KeNHA

What you need

  • A geo-referenced location map (UTM projection, Arc 1960 datum) showing the structure's coordinates and its position relative to the road and existing utilities
  • Detailed engineering design drawing and computations for the support structure, certified by a professional structural engineer

Steps

  1. Register or log in on the KeNHA Permits Portal (permits.kenha.co.ke) and select Advertisement structures (billboards, sign boards).
  2. Confirm the KeNHA region or corridor and the road where the structure will go, and apply separately for each region if you have several.
  3. Upload your documents and submit. After vetting, the region or corridor office contacts you to schedule a field visit.
  4. Once approved, you get a payment advice. Pay using the details on it, then wait to be contacted when the approval letter is ready.

Watch out

  • The fee is charged per square metre of advertising area, so a large billboard costs many times the base rate.
  • This covers KeNHA national highways only. Billboards on county roads go to the county government.

Who can apply

  • Businesses and advertisers who want to put up a billboard or signboard on a KeNHA road reserve
Official sources (3)
  1. Resolved Citizens Service Delivery Charter kenha.co.ke · read 2 Oct 2026
  2. Guideline for Roadside Development Control/Way Leave Online Applications kenha.co.ke · read 2 Oct 2026
  3. KeNHA Permits Portal permits.kenha.co.ke · read 2 Oct 2026

Was this helpful?

Share on WhatsApp · Report a mistake

Don't include your ID number or KRA PIN. We remove them if you do.